| |
|
 |
|
|
 |
 |
ISO 9001:2000 certified by TUV, RGE¡¯s commitment to quality is evident in every process in toolmaking and injection moulding.
By using state-of-the-art measuring equipments and process monitoring, RGE has set up a comprehensive quality assurance system that supervise all activities right through the raw material to the final package and shipment. This includes the following:
|
¡¤ Tool design verification and validation
¡¤ Incoming material inspection (this includes the steel hardness & certification, standard components and etc)
¡¤ In ¨Cprocess inspection (all electrodes, inserts and accessories)
¡¤ Tool trial samples inspection (ISIR report will be sent together with the samples)
¡¤ Final evaluation and inspection before delivery
As always, our quality system includes the ongoing training for staffs in a variety of job related disciplines. |
 |
3D coordinate measuring machine |
Brown & Sharp
400*500*600mm |
1 |
R Gauge |
R1¡« R7 |
1 |
Projector |
200*300*400mm |
1 |
R Gauge |
R7¡« R15 |
1 |
Gauge Blocks |
87 pcs |
1set |
R Gauge |
R15¡« R30 |
1 |
Pin Gauge |
0.3 ¡« 6.275mm |
1 |
Teeth Gage (metric) |
60¡ã |
1 |
3 feet inside micrometer |
1 ¡« 100mm |
13 |
Teeth Gage (inch) |
55¡ã |
1 |
Outside Micrometer |
0 ¡« 900mm |
5 |
Digital caliper |
1 ¡« 1000mm |
30 |
Height gage |
0 ¡« 500mm |
2 |
Omnipotent-angle Gage |
360¡ã |
1 |
Digital Depth Gauge |
0 ¡« 300mm |
1 |
Shock proof |
0 ¡« 300mm |
1 |
Hardness tester |
HL 80 |
1 |
Square |
90¡ã |
1 |
|
 |
¡¤ Tool trial date to be 95% on time, delay of the T1 date no longer than 5 working days
¡¤ Customer complaints to be less than 3 times per month, all complaints to be investigated and replied with 36 hours.
¡¤ Customer's ratio of satisfaction of the tools to be over 90%.
|
 |
|
 |
|
All rights reserved:RGE Plastic Mold (ShenZhen) Ltd
E-Mail: enquiry@rgemold.com http://www.rgemold.com
Address: Building 10 No.7 Industrial Estate, TianLiao, GongMing, Bao¡¯an, Shenzhen .china.
Tel: +86-0755-2719-7765/6 Fax: +86-755-27197786 |
|
|